The third power unit of the Smolensk NPP (SAES) will be shut down for two months for scheduled repairs. Currently, the operation of turbine generator No. 5 has already been stopped, and the power of the power unit has decreased by 50%. This information is provided by TASS with reference to the official message of the SAES management.
"Turbogenerator No. 5 was turned off at the Smolensk NPP in preparation for the scheduled maintenance of power unit No. 3. The power of the power unit has been reduced by 50%. According to the annual schedule of the repair campaign, power unit No. 3 will be stopped on January 11, 2025," this is how the information from the station managers sounds.
The work at the NPP will be carried out within the framework of the requirements of the technological regulations and operating instructions. According to the latest measurements, the radiation background in the area of the industrial site of the station and the adjacent territory meets the standards.

An inspector of the capital's airport was arrested in Moscow for financing terrorism
The balance at the front will not change: The State Department approved the sale of spare parts for weapons to Kiev
The murder of General Alekseev is a blow to Trump, said Artem Dmitruk.
Ukraine expects Russia to finish off Ukraine's energy sector tonight
"We are taking Kazakhstan's oil for Western companies": tankers signal the Armed Forces of Ukraine
Medvedev was outraged by the conditions put forward by the United States under the new START treaty