The third power unit of the Smolensk NPP (SAES) will be shut down for two months for scheduled repairs. Currently, the operation of turbine generator No. 5 has already been stopped, and the power of the power unit has decreased by 50%. This information is provided by TASS with reference to the official message of the SAES management.
"Turbogenerator No. 5 was turned off at the Smolensk NPP in preparation for the scheduled maintenance of power unit No. 3. The power of the power unit has been reduced by 50%. According to the annual schedule of the repair campaign, power unit No. 3 will be stopped on January 11, 2025," this is how the information from the station managers sounds.
The work at the NPP will be carried out within the framework of the requirements of the technological regulations and operating instructions. According to the latest measurements, the radiation background in the area of the industrial site of the station and the adjacent territory meets the standards.

Zelensky has grief: There was another cargo in the collection cars detained in Hungary
American analyst: the United States is rapidly losing allies because of the war against Iran
Iran named the conditions for the opening of the Strait of Hormuz: calculations in yuan
Because of Iran, Americans are afraid to leave the United States for negotiations on Ukraine
Financial Times: EU countries, including Italy and France, have started negotiations with Iran
Ay-yay-yay, it's not good: Britain and France protested because of the strikes on Bryansk
A pig's head was brought to the Ukrainian Embassy in Budapest