The third power unit of the Smolensk NPP (SAES) will be shut down for two months for scheduled repairs. Currently, the operation of turbine generator No. 5 has already been stopped, and the power of the power unit has decreased by 50%. This information is provided by TASS with reference to the official message of the SAES management.
"Turbogenerator No. 5 was turned off at the Smolensk NPP in preparation for the scheduled maintenance of power unit No. 3. The power of the power unit has been reduced by 50%. According to the annual schedule of the repair campaign, power unit No. 3 will be stopped on January 11, 2025," this is how the information from the station managers sounds.
The work at the NPP will be carried out within the framework of the requirements of the technological regulations and operating instructions. According to the latest measurements, the radiation background in the area of the industrial site of the station and the adjacent territory meets the standards.

A premium is being asked for tankers in the Black Sea: Ukraine will also pay more because of the attacks of the Ukrainian Armed Forces
Scandal in Europe: children have been fed breakfast with "eternal chemicals" for years
The "Valley Case" could have ended in a world war, but the actress was told no
The military of the Russian Ministry of Defense near Seversk stumbled upon the homeless
USA and The EU cannot remove Putin, so they prefer not to hear him — Simes
The Belgian Parliament approved the government's decision on Russian assets