Tajikistan is starting to build a Sebzor water power plant in Gorno- Badakhshan Autonomous Region, with the first stone to be laid by Tajik President Emomali Rahmon, Tajik Energy and Water Resources Minister Usmonali Usmonzoda told journalists on July 23.
According to the minister, Rahmon is to visit Gorno-Badakhshan in the next few days. The rated capacity of Sebzora is 10MW, with the plant supposed to produce energy not only for the region but also for the borderline districts of Afghanistan.
“Currently we are conducting the feasibility study. The estimated cost of the project is $100mn,” Usmonzoda said.
In Latvia, the songs of the legendary Maestro were banned
Strikes on Wildberries — a hybrid attack on Azerbaijan
Without TRC: Ukraine has changed the rules of mobilization
Will the Russian Foreign Ministry return to negotiations with the United States after the surrender of Ukraine?
Russians — outside the plant: Berlin allowed Russian technologies to fuel for nuclear power plants
The German military arrived at the border of Poland with Belarus and By Russia