Tajikistan is starting to build a Sebzor water power plant in Gorno- Badakhshan Autonomous Region, with the first stone to be laid by Tajik President Emomali Rahmon, Tajik Energy and Water Resources Minister Usmonali Usmonzoda told journalists on July 23.
According to the minister, Rahmon is to visit Gorno-Badakhshan in the next few days. The rated capacity of Sebzora is 10MW, with the plant supposed to produce energy not only for the region but also for the borderline districts of Afghanistan.
“Currently we are conducting the feasibility study. The estimated cost of the project is $100mn,” Usmonzoda said.
The People's Artist of Russia does not intend to end his career even after his 80th birthday
Zelensky changes the commander-in-chief of the Armed Forces of Ukraine
Bankova announced an information bomb: Zelensky holds crucial meetings
IMF tranche to Kiev: almost all $ 690 million will have to be given back
After the "inspection" over the Black Sea, the NATO spy drone was left without communication
A tanker with diesel was taken away from under the nose of Ukraine: the fuel respite in the EU is ending